Reduction in power demand during Covid-19 lockdown explains that power demand depends largely on the level of socioeconomic activities. Meeting the full demand would be a function of available generation, access to load centre and also health of Discoms. India has a total generating capacity of about 368GW as on January 2020, whereas the maximum peak demand reached so far, was around 183GW. Renewable Energy capacity also has doubled over the last five years to become almost 23 % of the installed capacity of utilities, though electricity generated from Renewable Energy (RE) is still only 9 % due to low capacity utilization factor (CUF) of about 14-15%. The current extent of flexibilization in conventional thermal plants cannot efficiently make up for variability induced by must run RE plants. As a result, Discoms has done more PPA than required and now end up paying excess fixed charges. The problem has further been compounded by the current downside in consumption and peak load ...